DOWNSTAIRS
Initial House painting:
Living Room accent wall and Dining Room Faux Finishing, man cave
Thermostat Replacement
Living Room Draperies
The year-long kitchen remodel which included:
Cabinets
Hardware
Granite
Backsplash
Sink
Faucet
Peninsula Chandelier
Accent Wall
Patio Doors
Kitchen artwork
UPSTAIRS
Guest Bath Refresh included painting & over-toilet towel rack
Master Bedroom Remodel included:
Painting
Artwork
New Furniture (when we moved into our house)
Flooring
Rug
Bedding
Draperies
Upstairs Hallway Nightlight Receptacle
Closet Door Giftwrap Organizer
Of course the Nursery/Bedroom3 Remodel which included:
Flooring
Painting
Furniture & décor
Ceiling Fan
Then there was the Flood which prompted:
New Washer & Dryer
Ceiling patching & painting
New flooring downstairs
Replacement carpet on 2nd floor hallway and staircase
Replacement Vinyl floor in laundry closet
Hallway art project
Hanging our Photo collage frame on the staircase
GENERAL
Getting things on the walls always seems to take forever. We still don't have this completely done.
Having my own space for art/crafting/sewing. This is a work in progress and my "art corner" from this post actually no longer exists. Thanks Pack & Play.
Landscaping will be the death of me. We haven't really done anything in the past couple years. Probably should get on that.
...I've been itching to tackle some projects lately. I feel like so many rooms are halfway how I want them, or we have things partially done. Instead of doing a little here and a little there, I think I want to start tackling one thing at a time to completely get it done. So, look for that list tomorrow and I will of course slowly update as things get checked off the list!
No comments:
Post a Comment
I'd love to hear from you!